Drift River terminal lightens its load: alert level lowered
<
>
Photo 1 of 2
<
>
The tanker Seabulk Arctic at berth at the Christy Lee loading platform. Mt. Redoubt volcano is shown in the background on Sunday, April 5, 2009. PHOTO BY COOK INLET SPILL PREVENTION AND RESPONSE INC. (CISPRI)

